Skip to content

Tiling

Fliesen YıldızEmre YıldızYour new bathroom in three weeks. With one contact person.

We strip out, waterproof and retile: bathrooms, showers, kitchen splashbacks and terraces in Cologne and the surrounding area. Plumbing and electrics are coordinated with regular partner firms, but you still only have one number to call.

  • 4.8124 reviews on Google
  • 4.941 reviews on ProvenExpert
Hands setting white wall tiles with spacers into combed adhesive
Master business · Cologne Chamber of Crafts
Years as a master business
15
Bathrooms tiled
600+
Weeks for a complete bathroom
3
Years of warranty under German law
5

Services

Rooms you will love living in

Careful work in lived-in homes: everything covered up, on time, handed over tidy.

Book a measuring visit
  • Complete bathroom renovation

    From strip-out to the last silicone joint. The plumber and electrician come from our partner firms, and we keep the schedule together.

  • Large-format and porcelain tiles

    Slabs up to 120 × 280 cm on walls and floors, using vacuum lifters, levelling systems and narrow joints. Also tile on tile where the base allows it.

  • Kitchen splashbacks

    Metro tiles, zellige or one single large slab behind the hob and sink. Usually done in a day, cut-outs for sockets included.

  • Terraces and balconies

    2 cm porcelain slabs on pedestals or in drainage mortar. With proper falls, drainage and frost-proof materials.

  • Natural stone

    Marble, travertine and slate for bathrooms, stairs and window sills. Laid with the right adhesive so nothing bleeds through or stains.

  • Barrier-free showers

    Floor-level instead of a tub, with a channel drain, slip-resistant tiles and room for a folding seat. We help with the application to the care insurance fund.

Projects

Work we are proud of

A few jobs from the last few months.

  • The same bathroom before, with old white tiles and a bathtub
    Before
    New bathroom with large stone-look tiles, walk-in shower and wooden vanity
    After

    Period bathroom fully renovated: tub out, walk-in shower inCologne-Ehrenfeld, 2025

  • The same kitchen before, cabinets covered in plastic during the work
    Before
    Kitchen with green cabinets and a glossy white splashback of handmade tiles
    After

    Splashback in handmade glazed tilesCologne-Nippes, 2026

  • Garden terrace with large light grey porcelain slabs and lounge furniture

    Garden terrace in 2 cm porcelain slabsBergisch Gladbach, 2024

  • Walk-in shower with large grey tiles, rain shower and wall niche

    Large-format shower with niche, barrier-freePulheim, 2025

How we work with you

From the first measurements to handover

  1. Step 1

    Visit and measuring up

    Emre Yıldız looks at the bathroom, measures up and checks pipes and substrate. Takes about 45 minutes.

  2. Step 2

    Choosing tiles and fixed price

    We go with you to the tile dealer in Cologne-Ossendorf. Then you get a quote covering all trades and a start date.

  3. Step 3

    Strip-out and waterproofing

    Dust wall, rubble removal, new pipes by our partners, then screed and waterproofing. Every layer gets photographed.

  4. Step 4

    Tiling, grouting, handover

    Laying, grouting, sanitary fittings installed. Finally we walk through together and hand over the photos and care instructions.

Our team

The people who come to your door

  • Master tiler Emre Yıldız smiling in front of an orange ladder

    Emre Yıldız

    Master tiler and owner

  • Foreman Tobias Krämer in front of an aluminium ladder

    Tobias Krämer

    Tiler, foreman

  • Tiler Marco Esposito with hard hat, safety vest and toolbox

    Marco Esposito

    Tiler, natural stone

  • Aylin Yıldız

    Office, planning and appointments

  • Kerem Aksoy

    Tiler

  • Jana Schulte

    Apprentice, 2nd year

  • „Three weeks were planned, and the bathroom was done after 17 working days. Ms Yıldız sent us a short message every Friday about what was coming the next week.“

    Stefanie BrandtComplete bathroom renovation, 2025Review on Google
  • „My wife can't get into the tub anymore. Mr Yıldız helped us with the application to the care fund and planned the shower so a seat will fit later.“

    Hans-Peter WolfWalk-in shower, 2025Review on ProvenExpert
  • „Started at eight in the morning, grouted and cleaned by the afternoon. The tiles around the sockets are cut to the millimetre.“

    Selin KayaKitchen splashback, 2026Review on Google
  • „The terrace turned out great, the fall is right and nothing wobbles. The start was pushed back a week because of rain, but we were told early.“

    Thomas LehmannTerrace, 2024Review on Google
  • „Two other firms didn't want to lay 120 cm slabs on our old screed. Mr Yıldız tested it, levelled it and then laid them. Not a single lip.“

    Claudia NowickiLarge-format kitchen-living room, 2024Review on ProvenExpert
  • „Punctual, tidy and swept clean every evening. My parents could discuss everything with Emre in Turkish, which gave them a lot of confidence.“

    Murat DemirciGuest WC and hallway, 2026Review on Google

FAQ

Frequently asked questions

Question not answered here? Give us a call, we are happy to advise.

How long will we be without a bathroom?

Usually three weeks for a complete renovation. Where possible we reconnect the toilet temporarily for the evenings. If you only have one bathroom, we plan so the shower is finished first.

Can we buy the tiles ourselves?

Yes. Let us know the format and quantity beforehand so we can plan offcuts and adhesive properly. For tiles we didn't source ourselves, our warranty covers the installation, not material defects.

Can you tile over the old tiles?

Often yes, if the old tiles are firmly bonded and there are no hollow-sounding spots. That saves dust and two to three days. We tap every surface when we measure up. In shower and bath areas we renew the waterproofing anyway.

Does the care insurance fund pay for a walk-in shower?

With a recognised care level, there is a grant of up to €4,180 per measure for home adaptations. Important: you must apply before work starts. We give you a quote with photos and a description for it.

How much dust and noise is there?

It gets loud mainly during the first two days of strip-out. We put up a dust wall with a zip door, lay cardboard along walkways and work with extraction. We inform the neighbours with a notice.

What does a complete bathroom cost?

A 6 m² bathroom with shower, WC and washbasin usually costs between €14,000 and €22,000 with us, including plumbing, electrics and tiles. We give the exact fixed price after measuring up, and list labour costs separately for your tax return.

Contact

Tell us about your project

A call or a short message with a few photos is enough. We get back to you by the next working day at the latest with an appointment or a first price range.